ASSIGNMENT 2 Embedded System Design Process for Interactive Space Device

 

ASSIGNMENT 2: Embedded System Design Process  for Interactive Space Device

Regarding assignment 2, we need to develop a detailed plan for the embedded system design process, make these contents into a PPT, and then submit it. In this assignment 2, we need to develop a detailed plan for the embedded system design process, make these contents into a PPT, and then submit it.
In this assignment 2, we need to identify and define system requirements, design embedded system architecture, select appropriate hardware components, and plan software and control logic.
So we started our embedded system design process.
Firstly, based on our previous assignment 1, we made changes from the concept of a digital pond to a touch-activated smart floor system, which controls the changes in OLED display through ceramic sensor vibration detection.
Regarding the content inside, the teacher provided an example. Regarding the format of assignment 2, we can study it based on the teacher's example of daydreaming. We can use the content titles in the example given by the teacher to write our embedded system design process. We have assigned each person's division of labor and who needs to do what.
Finally, we made our PPT.
The teacher reviewed our content before submitting, and he said there were no issues, so we submitted it.

Assignment 2 Embedded System Design Process,作者 tian dong Personal Reflection:
During the process of completing the embedded system design process PPT assignment 2, I gained a lot, and there are also many areas that need improvement.
On the positive side, I was able to adjust the plan based on the ideas from my previous assignment, shifting from a digital pond concept to a touch-activated smart flooring system, demonstrating a certain level of innovation and flexible adaptability. When dividing tasks and collaborating, I clearly defined my own tasks and conscientiously completed the corresponding parts, ensuring the progress of the team project.
However, there are also many issues. At first, there was some ambiguity in understanding the requirements, which resulted in some time being wasted in the early planning stage. In the selection of hardware components and software logic planning, due to insufficient professional knowledge, progress is slow, reflecting a lack of knowledge reserves. In addition, although there is division of labor in team communication, the depth of communication is not sufficient, and some content connections are not smooth enough.
In the future, I will strengthen my professional knowledge and learning and enhance my ability to interpret needs. At the same time, actively engage in deep communication with team members, optimize collaboration modes, and strive to perform better in subsequent assignments.